Manufacturer Backorder Information for All Safety Products, Inc.


*Note: Estimated shipping and lead times are not guaranteed (no expedited shipping) although we are still managing timelines well.
As of 04/06/21 10:44 a.m. Pacific Timezone (date and time will be updated when changes are made).
Special Note (Caution Recommended): A good link for preparing your own handsanitizer gel is found here, https://www.healthline.com/health/how-to-make-hand-sanitizer An alternate source for preparing a larger batch of hand sanitizer is found at the World Health Organization Website . Here is the WHO document uploaded in its entirety WHO Guide To Local Production.
Special Note: The following link is provided by the CDC for protecting yourself properly from the COVID-19 virus,
https://www.cdc.gov/coronavirus/2019-ncov/prepare/prevention.html .
For directions on preparing your own mask, Good Housekeeping has a helpful video along with detailed instructions on their website,
https://www.goodhousekeeping.com/health/a31902442/how-to-make-medical-face-masks/
Product Category (link) | Products Affected | Additional Product(s) Comments | Ordering Information |
First Aid | Branded Hand Sanitizers and Sanitizer Refills, Alcohol Wipes, Industrial Medications. | Hand Sanitizers and Sanitizer Refills, Alcohol Wipes, Industrial medications, have been affected. Subject to change. | See alternate suppliers page |
Hand Protection | Numerous Products (3M, SAS Safety, Microflex, etc.) | Disposable Gloves Subject to change. | See alternate suppliers page |
Head and Face Protection | Numerous Products (3M, Bullard, Radnor, etc.) | Faceshields Subject to change. | See alternate suppliers page |
Ozark River Sinks | Hand Wash and Utility Sinks. | Great News for Ozark Sinks: Long Lead Time Reduced to 10 to 14 business days. Premier Sinks are 3 to 4 business days. Ozark River Sinks by Series Subject to change. | Please utilize our “For Quote Only” tool on website to get latest manufacturer lead time and freight quote.Confirmed, processed orders will be locked in for priority. |
Portable Handwash Sinks / Sanitizers | PolyJohn, ASP, Satellite-PolyPortables, | 2 to 4 weeks on new orders for the newest twin sink (orders over 10 are 3 to 6 weeks) ASP-TITAN2-MINI 3 to 4 weeks on new orders for the following large capacity sink (orders over 10 are 4 to 6 weeks) ASP-TITAN2-LARGE 3 to 4 weeks on new small orders (under 10) for the following large capacity sink (orders over 10 are 6 to 8 weeks) ASP-TITAN-QUAD 2 to 3 weeks for the Freshstart Portable Showers Cold Water Freshstart Shower (Hot Option (2 separate water lines) Heated Freshstart Shower (single water line, heater) Approximately 2 weeks on new orders for ASP-HD-Twinsink (Best Lead Time in a while). 2 to 4 weeks for most Satellite-PolyPortables sinks 2 to 4 weeks for TAG2 2 to 4 weeks for TAG4 (NEW) 2 to 4 weeks for SuperTwin Sink 2 to 4 weeks for BREEZE Two User Sink 12 weeks for PSW3-1000 12-13 weeks for PSW3-2000G 1 week for PolyJohn SAN2-1000 (Emergency Hand Sanistand) 2 to 4 weeks for PolyJohn PS2-1000 (New Sink that replaces PS02-1000 and PSN1-1000 sinks) PS14-1000 sink is backordered until Beginning of April and SK3-1000, SK3-2000 and SK3-3000 sinks are presently backordered until Mid April. | Please utilize our “For Quote Only” tool on website to get latest manufacturer lead time and freight quote. Confirmed, processed orders will be locked in for priority. |
Portable Restroom / Portable Toilets | Portable Restrooms, Portable Sinks, Showers, Restrooms | Suspended by manufacturer for CT02-1000 Containment Tray for Tanks 1-2 weeks for most standard restrooms – one model, ASP-P-Pod is about 2 weeks out to ship. The PJN3 Series Restroom is experiencing a long delay, about 3 months due to materials shortage. 1-2 weeks for showers. Subject to change. | Please utilize our “For Quote Only” tool on website to get latest manufacturer lead time and freight quote. Confirmed, processed orders will be locked in for priority. |
Portable Restroom / Portable Toilets | Accessoris for Portable Restrooms, Portable Sinks, Showers, Restrooms | 1 to 2 weeks for Containment Tray, CT01-1000 for Portable Restroom Subject to change. | Please utilize our “For Quote Only” tool on website to get latest manufacturer lead time and freight quote. Confirmed, processed orders will be locked in for priority. |
Protective Workwear | Numerous products (3M, Kimberly Clark, SAS Safety Corp, etc.) | Coveralls are unknown due to high demand and sourcing issues for Chinese inbound products. Subject to change. | See alternate suppliers page |
Respiratory Protection | Numerous products (3M, Moldex, Honeywell, etc.) | All Types Of Respirators (N95, etc.) and Respirator Cartridges Subject to change. | See alternate suppliers page |